Subscribe to IER alerts HERE
  • Home
  • Projects
    • Biogenic Natural Gas
    • TRUenergy Partnership
    • Mineral Sands
    • Biofuels (Licella)
  • Resources
    • Exploration Licences
    • Biogenic Natural Gas
      • Natural Gas Resources
      • About BNG
    • Lignite (Brown Coal)
      • Lignite Resources
      • Resource Development
    • Mineral Sands
  • Technology
    • Lignite Upgrading
      • Cat-HTR Process
        • About Cat-HTR
        • Cat-HTR Products
        • Synthetic Crude
        • Micronised Coal
        • Pilot Plant
      • Other Technologies
    • Biofuels (Licella)
  • About Ignite
    • Background
    • Board of Directors
    • Key People
    • Disclaimer & Privacy
    • Contact Details
  • News
  • Contact Us
    • Enquiry Form
    • Contact Details
    • Subscribe to Ignite Alerts
About Ignite Background

Background

December 2005 Victoria Coal Resources Pty Ltd ('VCR') was incorporated to evaluate the potential of the coal-bed methane resources within EL 4416.
December 2005 - January 2006 VCR signed the Farm-in Agreement with Coal Bed Methane Resources ('CBMR') for the rights to all mineral resources and biogenic natural gas (natural gas in coal seams) within EL 4416.
September 2006 VCR signed a memorandum of understanding with Cougar Energy Limited (ASX: CXY) to investigate opportunities for underground coal gasification within EL 4416.
Early 2007 VCR undertook a preliminary feasibility study of technologies available to upgrade the lignite within EL 4416 to higher energy density fuels.
May 2007 Ignite Energy designed its continuous-flow pilot scale (Catalytic Hydrothermal Reactor) coal conversion technology.
June 2007 Ignite Energy Pty Ltd was officially formed and registered to commercialize the 'Cat-HTR Process'.
August 2007 CBMR commenced the Burong Pilot Production and Drilling Program to explore for biogenic natural gas within EL 4416.
October 2007 Ignite Energy appointed BEST Engineering to build a Cat-HTR Process Pilot Plant.
January 2008 IER's Pilot Plant was commissioned at Somersby, New South Wales.
June 2008 Lignite from the Hazelwood mine, located in the Latrobe Valley, Victoria, was successfully processed at Ignite Energy’s Pilot Plant.
August 2008 - September 2008 Ignite Energy Pty Ltd merged with Victoria Coal Resources Pty Ltd to create Ignite Energy Resources Pty Ltd ('IER').
September 2008 CBMR completed the Burong Pilot Production and Drilling Program, demonstrating the presence of permeable, gas-bearing coal seams within EL 4416.
September 2008 IER acquired the engineering assets of BEST Engineering.
December 2008 German (high sulphur) lignite was successfully processed at IER's Pilot Plant.
July 2009 IER signed a memorandum of understanding with TRUenergy, to host a Commercial Demonstration Plant (Cat-HTR Process) at Yallourn, in Victoria's Latrobe Valley. Click here to read the government press release
August 2009 IER acquired Licella Pty Ltd, the company that has developed a modified Cat-HTR Process to convert biomass into biofuels.
September 2009 Licella Pty Ltd successfully bid for $2.3 million in matching funds from the Australian Government's A$15 million Second Generation (Gen II) Biofuel Research and Development Program.
January 2010 IER and Coal Bed Methane Resources signed the CBMR Agreement in order to complete IER’s acquisition of EL 4416 and the equitable rights to ELA 4968.

News

  • TRUenergy Agreement Signed
    11 August 2011
  • CDP Construction Commences
    11 May 2011
  • Extension Granted on EL 4416
    28 April 2011
  • IER Raises A$20 Million
    14 March 2011
  • IER Signs Iluka JV
    29 October 2010
  • EL 4416 Acquisition Finalised
    22 January 2010
  • 1

About IER

» News
» Background
» Board of Directors
» Key People
» Contact Us

IER's Projects

» Biogenic Natural Gas
» TRUenergy Partnership
» Mineral Sands
» Biofuels (Licella)

Company Summary

Ignite Energy Resources Limited ('IER') is an Australian-based company focused on developing Exploration Licence 4416 ('EL 4416') and Exploration Licence Application 4968 ('ELA 4968'). EL 4416 contains extensive biogenic natural gas (BNG) and lignite (brown coal) resources, while both EL 4416 and EL 4968 are prospective for world-class heavy mineral sands deposits.

© Ignite Energy Resources Limited, 2011. All rights reserved. Site by Metro Web Design Scroll To Top